Go back

APG Leisure prepares to equip new Trowbridge Leisure Centre

APG Leisure is working with Alliance Leisure, Pellikaan Construction and Hadron Consulting to supply a comprehensive swimming pool equipment package for the new Trowbridge Leisure Centre, ahead of the project’s planned handover to the client in December.

From competition timing to swimming lessons, our package brings together specialist technology and equipment to support training, recreation and everyday pool operations.

Swimming timing system and LED video screen

We will be supplying and installing a full Colorado Time Systems swimming timing system and a large LED video screen within the pool hall, providing timing and display capabilities for swimming competitions and events.

Equipment for lessons, training and pool operations

Alongside the timing and display systems, we will be supplying:

  • Competition and training equipment: lane ropes, backstroke markers and a poolside pace clock.
  • Lifeguard rescue equipment and training aids: rescue tubes, reach poles, throw bags, an extraction board and CPR training equipment.
  • Swimming lesson and activity equipment: floats, swimming aids, diving rings, pull buoys and pool play equipment.
  • Aqua fitness equipment: water dumbbells and dedicated storage trolleys.
  • Pool cleaning and water testing equipment: a robotic pool cleaner, brushes, skimmers and water testing instruments.
  • Poolside signage and storage: lane and safety signage, mobile storage units and equipment trolleys.

Preparing for delivery and installation

We’re looking forward to getting on site and working with the teams at Alliance Leisure, Pellikaan Construction and Hadron Consulting as we move into delivery and installation.

We’ll share further updates and a closer look at the equipment as our part of the project takes shape.